Why Texas facilities need an arc flash study
An arc flash is a release of energy caused by an electrical fault through air. It can produce intense heat, pressure, molten metal and light in a fraction of a second, and it is one of the most serious hazards electrical workers face. An arc flash study quantifies that hazard at each piece of equipment so that your workers and contractors know the risk and wear the right protection before they open a panel, rack a breaker or troubleshoot energized equipment.
NFPA 70E, the Standard for Electrical Safety in the Workplace, requires an arc flash risk assessment before anyone works within the arc flash boundary of energized equipment. OSHA does not adopt NFPA 70E word-for-word, but its general industry electrical standards in 29 CFR 1910 Subpart S and the General Duty Clause require employers to protect workers from recognized electrical hazards — and OSHA routinely points to NFPA 70E as the recognized consensus standard for doing so. Read our plain-English NFPA 70E and OSHA guide for more detail.
Who needs an arc flash study
- Manufacturing plants with MCCs, switchgear and production equipment maintained in-house.
- Oil & gas and chemical facilities, from Permian Basin compressor stations to Gulf Coast refineries.
- Warehouses and distribution centers with conveyors, sortation and battery charging.
- Data centers and hospitals with UPS, generators and transfer switches that must be modeled in several operating modes.
- Commercial buildings with large services and in-house or contracted electrical maintenance.
- Electrical contractors who need a study for a client or for a new installation they are commissioning.
The 5-year rule and major modifications
A study is not a one-time document. NFPA 70E requires the arc flash risk assessment to be reviewed for accuracy at intervals not to exceed five years, and to be updated when a major modification or renovation takes place. Electrical systems change: utilities upgrade transformers, facilities add generators, production lines are added and breakers are replaced. Any of these can raise or lower incident energy, which means old labels may understate the hazard. If your labels are more than five years old, or you've made significant electrical changes since your last study, select “Arc flash update” in the form.
How the arc flash study process typically works
1. Scoping and quote
You submit a short request. The partner PE firm reviews it, may ask a few questions about equipment counts and existing documentation, and sends you a proposal.
2. Field data collection
Engineers or technicians visit your facility to document transformers, conductors, protective devices and settings. Having an existing one-line diagram can reduce field time, but it is not required.
3. Modeling and analysis
The system is modeled in engineering software to perform the short-circuit, coordination and incident energy calculations, commonly based on the IEEE 1584 method.
4. Report, labels and recommendations
You receive a report, updated one-line diagrams and arc flash labels, plus recommendations such as setting changes that can reduce incident energy. See our arc flash label guide for what labels must include.
What it costs
Every facility is different, but as an indicative guide small facilities often fall around $3,500–$6,000 and mid-size facilities around $6,000–$14,000, while larger sites are custom-quoted. Our arc flash study cost guide explains the factors that drive price.
Also available: SPCC plans
Facilities that store oil above EPA thresholds — generally more than 1,320 gallons of aggregate aboveground capacity — may need a PE-certified Spill Prevention, Control and Countermeasure plan. Learn about SPCC plans and request a quote.
Serving facilities across Texas
Requests are accepted statewide, with dedicated information for:
An honest note about this site
Texas Arc Flash Study is a quote-request service. We connect Texas businesses with a partner firm of licensed Professional Engineers. We do not perform engineering work, and we do not sign or seal studies. The engineering firm you're connected with is responsible for its services, proposal and deliverables.